Watford

2016

The Client’s requirement was to achieve an upstairs bathroom and for the third bedroom to have dedicated access, in addition they wanted to convert the downstairs bathroom into a utility room/downstairs toilet. They also wanted to replace the existing spiral stair with a more compact stair case. The enlarged kitchen was the benefit of the upstairs bathroom. As the site was constrained and located in a densely built up area, a pre-planning application consultation was sought.  Following design refinements relating to first floor window locations, the planners were satisfied with the proposal.

We are pleased that Planning Permission was granted in June 2016.